1) Railings installed and painted at back door of school // 2) Slate sills on back portion of school repaired, replaced as needed and then sealed // 3) Back stairs near north exit of cafeteria repaired // 4) Toilet in maintenance room repaired and one urinal in the boy’s bathroom // 5) Stained and polyurethaned Rectory door // 6) Sanded and painted front columns on school red // 7) Power wash, sand and stain all our eleven picnic tables // 8) Conversion to new Religious Education Office complete // 9) Conversion to new Kindergarten classroom complete // 10) A paved entrance to the ball field and Bazaar site installed. We should name it “The Midway.”