~The delivery of heat in the school gym and surrounding areas is being improved. The ducts on the floor are being raised to window level. Because the ducts were right on the floor they were destroyed. The new ducts are efficient and attractive. ~ The floor in the main cafeteria is cleaned and waxed. ~The back stairway in the school was cleaned and painted. ~ Some doors in the Rectory were sanded and painted. ~ New outdoor water faucet was installed by the gym kitchen area. ~ Cabinets in the gym kitchen restored. ~ Broken floor tile in gym cafeteria replaced. ~ Contract was signed for snow removal. ~ The school furnaces passed inspection by the Department of Health. ~ The tops of the pews have been scrubbed clean and re-stained. ** Your GENEROUS DONATION in the second collection for Maintenance & Repairs is at work. Thank you!**